无码人妻丰满熟妇区五十路_国产欧美日韩综合视频专区_欧美大荫蒂毛茸茸视频_国产精品理论片在线观看

Service Hotline : 400-690-2050

Contact Us

Service Hotline : 400-690-2050
Address: Guang'an Road, Bao'an District, Shenzhen Xin'an Section 147-3

Industry News

Position : Details
Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:771     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
国产一区二区三区视频在线观看 | 国产在线观看高清视频第一页 | 九九精品在线观看 | 麻豆91传媒精品无码少妇 | 免费观看黃色A片一级视频孕妇 | 中文字幕永久有效 | 3级生活片1级片黄色生活片1级片 | 久久久久99精品成人片免费观看 | 大又大又粗又硬又爽少妇毛片 | 麻豆亚洲AV成人无码一区精品 | 亚洲色无码A片一区二区红樱 | 免费国产凹凸在线视频 | 国产91麻豆精品国产人妻无码 | 国产精品 - 羞羞答答 | 杏吧成人无码区免费A片 | 国产成人无码一区二区三区 | 无码国产电影片在线观看 | 亚洲乱码少妇99p一二三囚区 | 精品亚洲国产成AV人片传媒 | 国产AV被 喷水噜噜噜 | 久久久久久免费免费麻辣 | 午夜精品久久久久久久第一 | 苍井空波多野结衣AA片 | 国产老熟女伦老熟妇A片小川桃果 | aV一级片在线播放 | 亚洲一区二区A片 | 亚洲精品无码超清在线观看 | 成人免费视频WWW在线观看我 | gogo久久精品日本无码 | 中文本幕 的搜索结果 - 91n | 黄色片免费看视频 | 无码免费婬AV片在线观看 | 国产激情无码大尺度内射 | 91丨色丨国产熟女 蘑 | 玩弄极品少妇被弄到高潮 | 三区免费无码视频 | 狠狠操婷婷五月天成人小说 | 91jiuse人妻视频 | 99久久a线观看品 | 国内精品亚洲一区 | 亚洲天堂视频欧洲一区二区三区 |