无码人妻丰满熟妇区五十路_国产欧美日韩综合视频专区_欧美大荫蒂毛茸茸视频_国产精品理论片在线观看

Service Hotline : 400-690-2050

Contact Us

Service Hotline : 400-690-2050
Address: Guang'an Road, Bao'an District, Shenzhen Xin'an Section 147-3

Industry News

Position : Details
Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:771     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
亚洲无码 在线播放 | 巨爆乳肉感一区三区三区 | 一级片乱世毛片免费看 | 久草狼人超碰在线 | 91秘 片黄在线观看 国产熟妇 码视频 一区二区三区国产 | 成人H動漫精品一區二區無碼 | 国产精品久久久久久蜜臀男女双修 | 国产偷人妻精品一区二区在线 | 国产盗摄女厕一区二区三区 | 国产一区二区视频区视区 | 中文字幕A片无码免费看 | 3D动漫 欧美H经典 一区二区 | 久久久久久AV无码免费网站动漫 | 少妇粉嫩BBBBBBBBB | 国产激情套图视频 | 全免费A级毛片免费看1 | www.又大又痛在线观看 | 91在线一区无码 | 极品少妇BBBBBB毛片日本 | 亚洲AV秘 无码一小夕野子 | 强伦轩人妻一区二区三区70后 | 色七七老司机美国人啪啪 | 久久成人精品视频 | 亚洲AV成人无码久久精品贰佰网 | 无码AV久久久久久久久 | 久久久久亚洲AV永久无码蜜芽 | 草比视频在线观看又大又长又硬又粗又黑 | 色综合7777欧美精品蜜桃 | 一本到蜜桃激情四射在线观看 | 欧美天堂中文字幕 | 精品国精品国自产在产国产 | 99久久人妻无码精品系列涩谷 | 在线观看午夜成人一区二区三区 | 日韩无码视频一区 | 一区二区三区不卡视频在线观看 | 人妻少妇一级A片 | 久久99老妇伦国产熟女 | 小向美奈子乳巨码无在线水澄 | 日韩在线www. | 色情脫衣舞在线观看视频 | 影音先锋成人无码在线观看 |