无码人妻丰满熟妇区五十路_国产欧美日韩综合视频专区_欧美大荫蒂毛茸茸视频_国产精品理论片在线观看

Service Hotline : 400-690-2050

Contact Us

Service Hotline : 400-690-2050
Address: Guang'an Road, Bao'an District, Shenzhen Xin'an Section 147-3

Industry News

Position : Details
Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:767     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
红桃视频一区二区三区 | 亚洲精品字幕在线观看 | 亚洲一区中文字幕 | 99精品丰满人妻无码一区二区 | 国产精品久久久国产盗摄蜜臀 | 精品国产乱码久久久久久免费舒淇 | 中文字幕AV电影 | 亚洲视频免费在线观看 | 国产精品久久久无码精品成人软件 | 日本黄色大片咪咪爱 | 四川猛少妇色XXXXX免费网站 | 中文字幕免费高清电视剧网站美美美元汇率 | 国产成人精品免费视频 | 中文字幕成人二区在线 | 国产亲子伦XXXXX熟妇91 | 西西444WWW无码视频软件 | 中文字幕永久在线视频 | 中文字幕视频在线免费在线看免费版 | 91精品91久久久仙踪林 | 国产精品一久线看观看 | 日本中文字幕在线播放 | 国产乱国产乱300精品 | 少妇w搡BBB搡BBB出血 | 特级西西444www大精品视频 | 久久国产免费观看精品A片全部露出 | AAAAAA妓女毛片A片 | 开心色婷婷综合五月天 | 最好看2019高清中文字幕全集剧情 | 国产综合久久久久久鬼色 | 国产目拍亚洲精品99久久精品 | 99国精产品一区二区三区A片 | 蜜桃精品一区二区三区 | 寡妇高潮一级毛片免费看中文字幕 | 国产在线精品国自产拍 | 嗷嗷射视频在线免费观看 | 四川少妇BBB搡BBB搡多人乱亂 | 国产在线麻豆秘 二次 | 中文人妻丰满熟妇伦子伦精品 | 91精品国自产在线观骚货 | 色欲av在线直播 | 超碰国产人人爽三级色欲av |