无码人妻丰满熟妇区五十路_国产欧美日韩综合视频专区_欧美大荫蒂毛茸茸视频_国产精品理论片在线观看

Service Hotline : 400-690-2050

Contact Us

Service Hotline : 400-690-2050
Address: Guang'an Road, Bao'an District, Shenzhen Xin'an Section 147-3

Industry News

Position : Details
Basement grouting waterproof plugging three major points of attention is not the key!
Author:Admin     Click:767     Time:2018-05-23 21:57:00

First, the key technology of grouting waterproof plugging in the basement

1, grouting as far as possible to fill the cracks, such as the complete closure of the crack, the other did not do waterproof will reduce the new damage.

2, to expand a certain waterproof area, will have been damaged parts of the water and may be damaged waterproof parts do not leak, reduce the repair after completion.

3. If the new project is completed, there will be a period of time when the main body of the building will be stable, and new cracks may still appear. Therefore, the scope of cracks may be expanded as much as possible during construction.

4. For concrete leakage, most of them are single or small or linear leaks. The drill bit shall be embedded in the way of grouting plugging. If complex situations have to consider a combination of multiple plugging methods.

5. For the leakage formed by broken cracks, construction joints, and post-pouring belts, the concrete can be plugged with grouting pipes or buried with water-proof needles. The plugging effect of the buried grouting pipe can be avoided. , It is better to embed the grouting waterstop needle.

6. For the seepage of settlement joints, most of them adopt the form of buried grouting pipes.

 

Second, the following preparations should be made before grouting:

1. Looking for cracks: For the water leakage at the leaking site, clean up the accumulated water and carefully look for cracks when the ground floor is cleaned. For dry substrates, clean the surface of the dust.

2. Drilling: According to the thickness of the concrete structure, the distance between the cracks is 150--350mm along both sides of the crack and the hole distance should be determined according to the actual situation on site. In most cases, there are 5-7 water-stopping needles per meter of cracks, and the cross section of the hole and the crack should be between 45 degrees and 60 degrees. The length of the water stop needle should be greater than half the thickness of the concrete.

3. Embedded water-stopping needles: The sealing-water needles are accessory parts. They are the connecting parts of the slurry injected into the cracks. When burying, the tools should be used to ensure that the rubber part of the needles will not slip out under high pressure.

4. The grouting pipe shall be buried with a V-shaped groove at the crack, cleaned with water in the tank, and the grouting pipe shall be used. The upper part of the grouting pipe shall be sealed with water without leakage, and then grouted into the grouting pipe. Normally, the buried pipe was cleaned on the day and the leak was blocked the next day.

Third, the grouting steps are as follows:

1. Pump pressure should be low when starting grouting and slowly increase the pressure until the slurry flows out.

2. During the grouting process, when it is observed that the grout completely replaces the leakage of water in the crack and overflows, it indicates that the grout has filled the crack sufficiently, and grouting from the grout can be terminated. Move to the adjacent grouting nozzle to continue grouting.

3, vertical cracks (including oblique joints) grouting should be performed from the bottom to the top; horizontal cracks (including nearly horizontal cracks) grouting should be carried out from the inside or from one end to the other.

4. After grouting in sequence, go back to the first grouting nozzle and inject it again.

5. After the grouting is completed, retain the grouting nozzle for more than 24 hours. If no grouting nozzle needs to be retained, the grouting nozzle may be cut or knocked off 24 hours after the end of the grouting.

6. After all the grouting is completed and the grouting material in the hole is solidified, the spilled grouting material shall be removed so that the base surface is clean and there is no wet or clear water.

7, cleaning grouting machine should be carried out immediately after the completion of the grouting, with special cleaning agent clear grouting equipment and tools.


Share : 
[ Print] [ Close]
国产福利在线观看视频_国产福利91 | 久久久无码人妻精品一区 | 牛夜精品高清久久久 | 丰满岳妇乱一区二区三区 | 欧美成人激情学习 | A一级夫妻生活在线观看视频 | 美女穿黑丝被操逼视频污污视频污视频污 | 午夜男人一级毛免费观看 | BT 另类 专区 欧美 制服 | 四川少妇BBBB槡BBBB槡 | 激情图片激情小说国产精品 | 搡老女人老91妇女老熟女 | 宾利AV影视在线观看 | 日日碰狠狠躁久久躁综合小说 | 四季AV综合网址 | 欧美xxxxx亚洲一 | 欧美大屁股熟妇BBBBBB | 日本美女老少妇腿内射精区一区二 | 欧美精品秘 入口蜜桃 | 国产一区二区三区裸体视频在线观看 | 国产精品秘 久久久久久免费 | 鸥美猛交XXXX乱大交蜜桃 | 真实乱视频国产海角社区 | 91人妻人人做人碰人人爽九色 | 337P嫩模大胆色肉噜噜噜 | 日韩无码福利视频 | seseaiai| 精品久久久理论片 | 人妻少妇91精品一区黑人 | 精品久久久久成人码免费动漫 | 男女那个永久免费视频 | 欧美一区二区三区在线观看视频 | 一区无码极品一卡一精品 | 97成人做爰A片无遮挡直播 | 久久婷婷五月国产色综合 | 黄色色情A片在线观看 | 午夜国产精品一二三区 | 国产精品久久久久久久毛片 | 国产精品一区二区在线观看无删减 | 国产亚洲中文字幕 | japan人妻.com|